XADIAHOTEL · NEW YORK
中文EN
Rendering of the Xadia Hotel entrance, glass facade, illuminated canopy and lobby
Proposed entrance · architectural rendering

58 WEST 39TH STREET · NEW YORK

BRYANT PARK, MIDTOWN MANHATTAN

XADIA HOTEL

Midtown Manhattan
A boutique hotel investment

INVESTMENT OVERVIEW

Capital plan in the original business plan
Total project investment
$143.19M
Approximately US$143.2 million
Planned developer equity
$55.59M
38.8% of total investment
Maximum proposed EB-5 raise
$33.60M
For remaining construction and completion

M denotes millions of US dollars. For equity definitions and reconciliation notes, see Capital.

A new boutique hotel
in the heart of the city

Where business and travel meet in Midtown Manhattan.

Developed by H Hotel LLC at 58 West 39th Street, the project envisions a high-rise boutique hotel with a rooftop lounge and outdoor spaces for business, leisure and international travelers.

185KEYSPlanned guest rooms
41FLOORSHotel tower
110,113SQ FTPlanned gross building area

Project figures follow the BP v6 overview and remain subject to the latest approved drawings. Differences from published design materials are explained in the source comparison.

Architectural rendering of the Xadia Hotel tower
Tower exterior · architectural rendering

Midtown Manhattan
Bryant Park

Between Fifth and Sixth Avenues.
Parks, culture, shopping and transit
shape everyday life in the neighborhood.

Project map showing 39th Street south of Bryant Park; the green star marks the site
Map from the original project materials. The green star marks the site.
01

Parks & culture

Bryant Park
New York Public Library

02

Shopping & entertainment

Fifth Avenue
Times Square & Theater District

03

City connections

42 St–Bryant Park subway station
Penn Station rail hub

58 West 39th Street, New York, NY

View on map

Designed for city stays

Floor-to-ceiling windows, contemporary interiors and varied room layouts.
Space for different ways to stay in Midtown.

Guest room rendering, not a photograph of completed construction.
108Queen rooms
40Double / double rooms
35King rooms
2Suite
39F / 40F

A two-level rooftop bar

An indoor lounge on floor 39 and an outdoor terrace on floor 40 are planned as elevated communal spaces.

EVERYDAY COMFORT

Everyday amenities

Plans include a fitness center, lobby workspace, grab-and-go pantry and ground-floor outdoor courtyard.

55 WEST 38TH STREET

Dedicated back-of-house space

The associated property is planned for administrative offices, storage, staff facilities and a kitchen.

ARCHITECTURE & PUBLICATIONS

Distinctive architecture.
An urban perspective.

Marin Architects brings hospitality design to the constraints of a New York City site. A cantilevered form and nighttime lighting define the tower, while rooftop dining and shared spaces extend the guest experience.

25FT

Cantilever design

The architect's project page describes a cantilever extending approximately 25 feet over the neighboring property to increase upper-floor space. This reflects the publicly presented design.

View the Marin Architects project
MEDIA COVERAGENew York YIMBY

New renderings revealed for Xadia Hotel

Michael Young's article presents updates to the tower design alongside renderings of the glass-roofed courtyard, entrance lobby, rooftop spaces and guest interiors, documenting the design and construction stage at the time.

Read the New York YIMBY article

Historical coverage of the design's evolution. Construction progress and completion estimates in the article do not describe the project's current status.

Project figures & source differences

Published sources and the business plan give different project figures. The comparison retains each source's figures and does not establish the latest approved scheme.

Project figures by source
SourceRoomsFloorsArea (sq ft)
BP v6 project overview18541110,113
Marin Architects project page1734296,712
YIMBY · January 25, 202417342Not stated

The main presentation follows BP v6. Current room counts, floor counts, building area and completion dates should be confirmed against approved drawings and formal project updates.

The capital structure

Total development budget in the original business plan

$143,192,988USD
Developer equity38.8%
$55,592,988
Senior debt37.7%
$54,000,000
Proposed EB-5 capital23.5%
$33,600,000

CAPITAL SOUGHT

Proposed raise of up to $33.60M

The original plan proposes an EB-5 loan for remaining construction and completion,
including MEP systems, curtain wall, interiors and equipment installation.

View the development budget
Total development budget · US dollars
Use of fundsAmount
Land-related costs$38,750,000
Hard construction costs$74,270,671
Architecture & engineering$2,277,434
Furniture, fixtures & equipment$2,710,000
Other soft costs$14,096,530
Financing costs$11,088,353
Total investment$143,192,988

Based on the BP v6 sources-of-funds table. Equity is a capitalization plan, not confirmation of funds contributed or available cash. The narrative separately refers to approximately US$60 million of equity; these figures require reconciliation. The raise, interest rate, term and investment conditions are subject to formal documentation.

PROGRAM OVERVIEW

Understanding EB-5.
Start with the official rules.

EB-5 is the fifth employment-based immigrant preference category. Eligible investors may apply for permanent residence by investing in a new US commercial enterprise and meeting job creation and other requirements.

USCIS program overview
Qualifying TEA / infrastructure projects
$800,000
Minimum investment
Standard investment category
$1,050,000
Minimum investment
Minimum jobs per investor
10JOBS
Qualifying permanent full-time positions

These are general program requirements, not confirmation that this project has been approved. Investments must also satisfy lawful source-of-funds, at-risk capital and other requirements. Applicable amounts, eligibility and filing requirements are governed by USCIS rules in effect at the time of filing.

TARGETED EMPLOYMENT AREA

TEA research for the project location

Owner-provided map screenshot
Original screenshot supplied by the owner; capture date not specified. Baker Tilly is identified as the map sponsor.
Result shown in the screenshot

High unemployment area · Qualified

Selected area: Census Tract 84, New York County.

Data source
ACS 2020–2024 five-year data
Tract grouping
Selected tract + 6 adjacent census tracts
Rural area
Not Qualified (screenshot result)

This is a third-party map result, not a USCIS TEA determination or project approval. The project's TEA eligibility is subject to USCIS review of formal analysis under the applicable rules. Qualified advisers should review the final investment and immigration documents.

Read the USCIS questions & answers on TEAs

This section provides general information, not legal or investment advice. It offers no assurance of principal repayment, returns, visa availability or immigration outcomes. Information compiled on .

Hotel tower construction photograph from the original business plan, not a current progress record
Construction photograph from the original business plan

Primary structure
completed

Approx. 60%

HVS construction completion estimate

According to the original business plan, remaining work includes MEP systems, curtain wall, interiors, equipment installation and final inspections.

Original project schedule

The original schedule targeted completion in December 2026 and opening in January 2027. It does not confirm the current construction or opening dates.

Current construction progress, permit status and opening plans await an update.

The team behind the project

Leo Ge

Manager, H Hotel LLC
Chief Executive Officer, Crosscity Construction Corp

Architecture
Marin Architects
Structural engineering
GACE Consulting Engineers
MEP engineering
All City Engineering, P.C.
Economic impact analysis
Baker Tilly Advisory Group, LP

INVESTMENT INQUIRIES

Discover the project.
Start a conversation.

Download the 12-page brief (Chinese) PDF

Leo Ge

H Hotel LLC

58 West 39th Street
New York, NY

InvestmentProject brief (Chinese PDF)

Guest room renderings

Guest room rendering

Design rendering, not a photograph of completed construction.

01 / 02

TEA research · owner-provided screenshot

Original TEA map for Census Tract 84. High unemployment area: Qualified. Rural area: Not Qualified.

Third-party research screenshot, not a USCIS determination or project approval. On mobile, swipe horizontally to inspect details.